瀚鼎科技 HANNSTARFMCS · 14 座工厂在线 · 示例14 PLANTS ONLINE · DEMO
员工入口Staff 项目咨询Start a project
工厂机电 · 工程技术系统集成商PLANT M&E · ENGINEERING SYSTEMS INTEGRATOR

一座能长期稳定运行的工厂。A plant that runs reliably for decades.

设计、安装、运维,一家统管,一个责任出口。Design, installation and operation — one group, one point of responsibility.

数字孪生 · 示意DIGITAL TWIN · SCHEMATIC
拖动或移动鼠标环绕查看DRAG OR MOVE POINTER TO ORBIT
冰水机房 · 实时CHILLER PLANT · LIVE{{ clock }} · 示例数据DEMO DATA
{{ cop }}机组负载CHILLER LOAD
供 / 回水温SUPPLY / RETURN
{{ tSup }}/{{ tRet }}℃
冷量COOLING LOAD
{{ load }}kW
告警ALARMS
0正常NORMAL
在线点位POINTS ONLINE
1,284100%
负载 · 近 60 分钟LOAD · LAST 60 MIN%
01 · 系统总览SYSTEM MAP

一座工厂,要同时跑起来约 23 个系统。A plant runs around 23 systems at once.

它们彼此耦合:一个系统的参数会决定另一个系统的选型与布局。孤立设计,代价在别处付。They are coupled: one system's parameters set the next one's selection and layout. Isolated design is paid for elsewhere.

23 / 23 在范围内IN SCOPE
A · 冷热源与气体动力HEATING, COOLING & GAS9
空调系统HVAC冷冻站Chiller plant工艺冷却水Process cooling water热水系统Hot water热媒油锅炉Thermal-oil boiler空压系统Compressed air真空系统Vacuum气动专业Pneumatics特气专业Specialty gases
B · 给排水与环保WATER & ENVIRONMENTAL5
给排水系统Water supply & drainage中央加药Central dosing集尘系统Dust collection废气系统Exhaust treatment消防系统Fire protection
C · 机电安装M&E INSTALLATION5
高低压配电HV/LV distribution照明系统Lighting洁净车间Cleanroom自控专业ControlsFMCS 厂务系统FMCS
D · 土建装饰CIVIL & FIT-OUT4
结构专业Structure装饰专业Decoration装修专业Fit-out地面工程Flooring
瀚鼎的定位OUR POSITION

工程技术系统集成商——23 个系统全部在业务范围内,一家统管,一个责任出口。Engineering systems integrator — all 23 systems within our scope, one company, one point of responsibility.

02 · 设计流程DESIGN PIPELINE

五个阶段,每个阶段都有可验收的交付物。Five stages, each with an accepted deliverable.

每个阶段都有署名负责人与验收交付物。业主拿到的不是一份报价,而是一套可直接用于发包的图纸与清单。Every stage has a named lead and an accepted deliverable. The owner receives a tender-ready set of drawings and schedules.

01DEFINE

定题Define

范围确认、组织架构、进度计划Scope, organisation, schedule

交付 · 范围清单 · 架构图 · 进度表OUT · SCOPE · ORG · SCHEDULE
02VERIFY

校数Verify data

水电气基础数据、无尘室参数、末端优化 8 项Utility baselines, cleanroom parameters, 8 optimisations

交付 · 数据校对与建议书OUT · DATA CHECK REPORT
03SELECT

选方案Select options

115 项选配逐项比选,选型与机房布局115 options compared; equipment and layout

交付 · 选配确认表 · 方案设计书OUT · SIGN-OFF · CONCEPT
04DRAW

出图Drawings

平面图纸与全专业 BIM,碰撞检查与管线优化Plans plus full-discipline BIM and clash checks

交付 · 全套图纸 · BIM 模型OUT · DRAWINGS · BIM
05TENDER

发包Tender

技术要求、品牌库、工程范围与清单、招标文件Requirements, brand library, scope, BoQ, tender docs

交付 · 招标四件套OUT · TENDER PACK OF FOUR
03 · 机房 · 自有交付PLANT ROOMS · IN-HOUSE

八类机房,我们自己交付,也自己盯着它运行。Eight plant rooms — built by us, and watched by us.

设计与自控是集团自有能力,机房由属地公司施工与运维。照片均为瀚鼎项目现场;遥测值为示例。Design and controls are in-house; plant rooms are built and run by our regional companies. Photos from Hanstar sites; telemetry shown is illustrative.

04 · 工程实绩台账PROJECT LEDGER

14 座整厂项目,用硬数据说话。Hard numbers from 14 turnkey plants.

NO.项目PROJECT地点LOCATION洁净等级CLASS建筑面积 ㎡FLOOR m²洁净室 ㎡CLEANROOM m²系统SYSTEMS
{{ p.no }}{{ p.zh }}{{ p.en }}{{ p.locZh }}{{ p.locEn }}{{ p.cls }}{{ p.area }}{{ p.cr }}{{ p.sys }}
Σ{{ sumLabelZh }}{{ sumLabelEn }}{{ sumArea }}{{ sumCr }}{{ sumSys }}
05 · NEXT

设计一座工厂,不是把 23 个系统各自做对,而是让它们作为一个整体成立。Designing a plant is not getting 23 systems right one by one — it is making them work as one.

我们能做的WHAT WE DO
设计咨询 + 工程安装 + 运维管理Design + installation + operation

一家统管,一个责任出口One group, one point of responsibility

交付节奏RHYTHM
按阶段验收的全套设计成果A full design package, accepted by stage

五个阶段,12 份交付物Five stages, twelve deliverables

接下来NEXT
从一次现场勘察开始Start with a site visit

带上产能目标与厂房平面,我们先给出设计范围建议与排期思路 · 0769-38937568Bring a capacity target and a layout; we come back with a scope proposal and a scheduling approach · 0769-38937568

首页HOME/METHOD

我们如何设计一座工厂How we design a plant

从一个产能目标,到一座能长期稳定运行的工厂。五个阶段、12 份交付物——每一步都有署名负责人与可验收的交付。From a capacity target to a plant that runs reliably for decades. Five stages, twelve deliverables — each step with a named lead and an accepted output.

系统SYSTEMS
23
阶段STAGES
5
选配项OPTIONS
115
责任出口POINT OF RESPONSIBILITY
1
交付物DELIVERABLES
12
01 · 诊断DIAGNOSIS

常见做法为什么失败:机电设计的六大坑。Why the usual approach fails: six M&E design traps.

这道题难在五个地方——专业范围广、适用性、多样性、复杂性、技术性。业主真正需要的不是某个专业的施工队,而是有人把整道题算清楚并对结果负责。The problem is hard in five ways — scope, fit, choice, complexity, depth. An owner needs someone who works the whole problem and answers for the result, not a trade contractor.

01风险RISK

需求性招标Tendering on a wish-list

没有系统性设计就直接招标:方案参差不齐,价格无从比较。No system design before tender: incomparable proposals and prices.

解法 · Fix · 设计标单独发包,一家完成整体机电设计tender the design separately; one designer owns the scheme
02风险RISK

招标文件专业度不足Unprofessional tender documents

答疑反复、文件反复修正,商务拖慢建设计划。Endless clarifications and revisions delay the schedule.

解法 · Fix · 系统性招标文件,竞标方一次看懂、快速报价systematic documents bidders understand at first read
03风险RISK

工程范围模糊Vague scope

漏项多、追加多,预算不可控。Omissions and add-ons blow the budget.

解法 · Fix · 按专业列全工程节点,双方明确负责范畴list every node per discipline; both sides sign off
04风险RISK

品牌及技术要求不够细致Loose brand and technical specs

工程质量问题投运后才暴露。Quality problems surface only after start-up.

解法 · Fix · 品牌库 + 施工工艺与技术要求写清楚a brand library plus written workmanship requirements
05风险RISK

非本行业设计模式Patterns from other industries

不贴合生产实际,运维困难、投资偏高。Poor fit with production, hard maintenance, high capex.

解法 · Fix · 115 项选配定制设计,按业主诉求逐项比选115 configurable options compared item by item
06风险RISK

机电 BIM 建模缺失No M&E BIM

施工碰撞交叉、管道折弯增多,返工与争议随之而来。Clashes and extra bends lead to rework and disputes.

解法 · Fix · 全专业 BIM,碰撞在开工前暴露full-discipline BIM; clashes surface before work starts
02 · 五个阶段 · 每一步做什么、交付什么FIVE STAGES · WHAT EACH STEP DOES AND DELIVERS

我们的答法:从产能目标到投产的五个阶段。Our method: five stages from capacity target to start-up.

01
STEP 01 · DEFINE

定题 · 先把范围、人、时间钉死Define · pin down scope, people and time

23 个系统逐项签字——哪些由我们做、哪些业主自理、哪些由设备厂商随机配套;每个专业都有署名负责人,不换人、不转手;进度节点顺序排序、透明可查。All 23 systems signed off one by one — ours, the owner's, the vendors'; a named lead for every discipline, no hand-offs; milestones in sequence, with transparent progress.

范围清单SCOPE LIST架构图ORG CHART进度表SCHEDULE
02
STEP 02 · VERIFY

校数 · 业主给的数据,我们先校一遍Verify · we check the owner's data first

用瀚鼎项目数据库与已完工项目实测值比对业主提供的设备需求;洁净室参数逐项校对;工艺设备末端优化 8 项。Owner-supplied demands checked against our database and measured values from completed plants; cleanroom parameters verified; eight terminal optimisations.

数据来源DATA SOURCE
已完工项目实测MEASURED, COMPLETED PLANTS
末端优化TERMINAL OPTIMISATIONS
8 项ITEMS
这类判断的时机WHEN THIS CALL IS MADE
设计阶段DESIGN STAGE
115 项选配 · 按专业115 OPTIONS · BY DISCIPLINE
给排水Water49
暖通HVAC27
环保Environ.17
配电Power13
通用General9
STEP 03 · SELECT

选方案 · 115 项选配,逐项算给业主看Select · 115 options, each costed for the owner

每一项都附功能性差异说明、造价成本差异、运行费用测算与运维影响。业主自己选,我们不替业主决定花钱的方式。Each option carries its functional difference, cost delta, running-cost estimate and O&M impact. The owner chooses.

选配确认表OPTION SIGN-OFF方案设计书CONCEPT REPORT
04BIM
STEP 04 · DRAW

出图 · 方案设计书与全专业 BIM 建模Draw · concept report and full-discipline BIM

以系统为单位的整厂机电设计方案书;BIM 由瀚鼎自有建模组完成:机房 + 车间 + 管井与室外管路,配漫游视频并与现场实装逐处对照。BIM 让碰撞在开工前暴露,管线走向按设计落地。A whole-plant M&E concept report by system, and BIM by our own team — plant rooms, workshops, shafts and outdoor lines, checked against the installed work. BIM makes clashes surface before work starts and keeps routing to design.

全套图纸FULL DRAWING SETBIM 模型 · 漫游视频BIM MODEL · WALK-THROUGH
05
STEP 05 · TENDER

发包 · 让预算守得住的四件套Tender · the four-part pack that holds the budget

各专业技术要求;品牌库(价格、质量、售后、性价比四维,给依据不拍板);工程范围与工程清单(无漏项、无争议,综合单价/总价双口径);招标文件——竞标方一次看懂、快速报价。Technical requirements per discipline; a brand library rated on price, quality, service and value; scope and BoQ with no omissions or disputes; tender documents bidders understand at first read.

招标书INVITATION招标图纸DRAWINGS专业要求REQUIREMENTS招标清单BOQ
03 · 交付之后AFTER HANDOVER

交付之后,我们还留在现场。After handover, we stay on site.

设计、施工、运维在同一集团内闭环。调试、运维与厂务系统的具体做法,现场沟通时详谈。Design, construction and operation close the loop inside one group. Commissioning, O&M and facility-system details are best discussed on site.